The McFarland Community Ice Arena expansion is finished: a three million dollar project adding more than 13,500 square feet and growing the facility by over half.
The build added a second sheet with a 50 by 90 practice rink, two off-ice shooting lanes, an athletic performance room, a conference room with kitchenette, and two new locker rooms for the Starion Bank Rink. The lobby was expanded and finished in polished concrete, and the players entrance is power assisted.
Roughly nine months of construction. Bachmann handled both the design and the build.
